The Dulux Concrete & Paving Crushed Pebble Effect roller design ensures even coverage and helps achieve the intended finish when applying Dulux Concrete & Paving Crushed Pebble Effect*.
*MUST USE TO APPLY CRUSHED PEBBLE EFFECT TOPCOAT
Bare concrete and Sealed surfaces once appropriate preparation has been completed using the Dulux Concrete & Paving Stage 1 and 2 products.
1. Wash the roller in clean water before use to remove any dust or loose fibres.
2. Spin the roller to remove excess water before first use .
3. Ensure that the roller frame spins freely.
1. Wrap the roller in plastic film or aluminium foil between paint applications to avoid paint drying on the roller.
2. Do not leave wrapped up for more than 24 hours.
3. If there are delays between successive coats wash the roller and store for next use.
1. Never allow paint to dry on the roller.
2. Thoroughly clean the roller with clean water immediately after use.
1. Never allow paint to dry on the roller.
2. Thoroughly clean the roller with clean water immediately after use.
Add a textured decorative look to your patios, steps, and paths without having to replace the surface.